siquijor resort construction restaurant

PROGRESS JULY AND AUGUST

Installing the tiles in the cottages. Constructing the bamboo railings on the outside of the cottage terraces. Putting  the nipa roofing onto the restaurant wood framing compacting the floor for the restaurant, then rough in plumbing and electrical, tie rebar matting then pour cement for the slab. Finishing the restaurant with tiles, paint, firewall, etc

SPANISH STYLE VILLA CONSTRUCTION PROGRESS UPDATE 08 30

Layout and excavation for column footings Fabricating the rebar matting for footings and columns Pouring the footing then forming and pouring the columns with concrete Getting started on the cement hollow block walls Preparing the forms for the round columns on the terrace and putting in place  reinforcement for beams at the first floor Getting…

BALI STYLE COMMUNITY PROGRESS APRIL-JUNE

Since the last construction update, the big push has been on to get all the walls up. The exterior walls are all of 6″ CHB while most interior walls are 4″ Once the walls are up, we formed and poured the remaining column and started on fabricating the steel reinforcement for the future concrete roof…

DAUIN SEMI DETACHED HOME PROGRESS 06/30

A lot has happened on this construction project since we last posted an update around mid-March. Structural columns and beams made of reinforced concrete. Fabrication and installation of steel roof trusses. Electrical and plumbing rough-in. Parging of walls with cement rendering Framing of the ceilings. Installing fascia , eaves trough and metal roofing panels over…

DAUIN SEMI DETACHED HOME CONSTRUCTION UPDATE 03/15

THIS HOUSE IS FOR SALE (ONLY 6.5 MIL PHP)- IF INTERESTED , PLEASE VISIT THIS LINK https://dumaguetedreamhomes.com/portfolio/casa-alexandria-dauin-community/#sd-duplex-1 After excavation, it is time to prepare and install the steel reinforing rod for the footing ,columns and tie beams. Being a 2 story structure on sandy soil , we use 16 mm rebar for everything to ensure…

VILLA CONSTRUCTION UPDATE MARCH 15TH

When we started excavation, we ran into a not totally unexpected issue. Being on a plateau in the hills there was the high likelihood that we would hit rock when digging and sure enough it was there. We adapted and decided that instead of doing a large scale excavation for the entire footprint of the…

sea wall construction

SEA WALL CONSTRUCTION AND FENCING

The cottage has basically been finished and turned over to the client, and now it is time to make the site secure and livable. We start with building a 2.2 meter high chb wall along the public access beach walkway. This involves constructing reinforced concrete columns, then filling in between with  concrete hollow block set…

CONTINUING SITE DEVELOPMENT

Site Development for this project involves many different components. The first thing we have done is build a large bunk house and storage facility. For this project, we will be here for a longer period and have many more workers than normal so we have not skimped on size and space. The next thing is…

construction of wall

FENCING

Now that the house is complete and the clients occupying it, they have decided that the next phases of development will be site upgrades including wall and fencing. The existing fencing on the North boundary beside the road, consisted of precast cement posts, a knee high cement hollow block wall, topped with chain link fencing.…

FOOTINGS FOR COLUMNS AND WALLS

After the excavation, we have fabricated our steel reinforcing for the column and footings. Once set in place approximately 2″ above a 6″ layer of choker rock within the excavated holes, we pour cement. After the column footings are poured, we pour wall footings between the columns and start with the concrete hollow block. The…

demolition of existing house

SITE MOBILIZATION AND DEMOLITION

The first step has been to build a bunkhouse and bodega. Our men stay on iste during the week so we need a place for them to sleep, as well as a place to store our materials that is safe and dry. The next step is to get rid of the existing building on the…

painting the exterior of the home

PAINTING

With the majority of the basic work finished, we are touching up interior walls to prepare for painting. We are also doing the painting for the exterior.

tiling

TILING

With the painting of one unit complete, the painter has moved over to the next and allowed us to get started on the tiling. Tiles are set with a mixture of cement and tile grip and carefully leveled.  We will continue on with this progression of work so that the different trades men are not…

taping and sanding of drywall ceiling

TAPING AND SANDING OF THE CEILING

Before finishing the drywall application of the ceiling, we do one last check to ensure all the plumbing and electrical to be located within the ceiling is 100% complete. Once all the base coat of the walls is complete and the grid and boarding of the ceiling finished, our next step is the taping and…

modern - balinese style community

SITE DEVELOPMENT

With this project, there will be many components that all have to fit in together/ Careful planning has to be done so that all the site infrastructure is completed properly in the right locations or the entire community lay out will be affected. The first thing we have done is get in a geodetic engineer…