SAN MIGUEL HOUSE FINISHING

Our Clients have graciously been a little flexible on the turn-over date of their new home, due to the typical slowdown over the Christmas Holidays. Currently we are at the finishing stages of this construction and are completing tiling, cabinets and granite counter tops, painting, plumbing and electrical fixtures. Our major push in the closing few weeks of this contract is to have all plumbing and electrical hooked up so that we can energize and pressurize the system to see if any last minute tweaks are required. With the painting almost complete, we have also been able to have the aluminum windows installed.