VILLA CONSTRUCTION APRIL TO JUNE
CHB wall construction for the ground floor level
Building columns with reinforcing rod, then forming and pouring concrete
Stripping the basement roof forms and starting to excavate and prepare the master bedroom suite
Building all the roof beams
Putting up the Concrete Hollow Block Walls in the master bedroom
Rendering the CHB walls
Digging out, forming and pouring the floors to the master bedroom
Preparing and pouring the master bedroom floor slab.
Fabricating and installing steel trusses and C purlins