BOARDING AND INSULATING OF CEILING
With the roofing complete and watertight, our men have moved on to finishing the ceiling. First, the grid is insulated using 2″ expanded polystyrene rigid insulation, then the gyproc boards are screwed into place. Holes are cut where light fixtures are to be installed and all electrical conduit is placed to those locations. We are also continuing on with the fencing, concetrating on building a retaining wall on the south side of the house and backfilling with soil in order to provide the proper grading.