CHB WALLS AND SEPTIC TANK
For the walls, we have used a special mixture cement hollow block, with 10 mm steel reinforcing rod tied in both horizontally and vertically. Over all doors and windows we have formed a reinforced concrete lintel.
![](https://negrosconstruction.com/wp-content-old/uploads/2017/10/thumb/0924171516.jpg)
![](https://negrosconstruction.com/wp-content-old/uploads/2017/10/thumb/0924171516a.jpg)
![](https://negrosconstruction.com/wp-content-old/uploads/2017/10/thumb/0924171516b.jpg)
![](https://negrosconstruction.com/wp-content-old/uploads/2017/10/thumb/0924171516c.jpg)
![](https://negrosconstruction.com/wp-content-old/uploads/2017/10/thumb/0924171517.jpg)
![](https://negrosconstruction.com/wp-content-old/uploads/2017/10/thumb/0924171517a.jpg)
![](https://negrosconstruction.com/wp-content-old/uploads/2017/10/thumb/0924171517b.jpg)
![](https://negrosconstruction.com/wp-content-old/uploads/2017/10/thumb/0924171518.jpg)
![](https://negrosconstruction.com/wp-content-old/uploads/2017/10/thumb/0924171518b.jpg)
![](https://negrosconstruction.com/wp-content-old/uploads/2017/10/thumb/0924171518c.jpg)
![](https://negrosconstruction.com/wp-content-old/uploads/2017/10/thumb/0924171519.jpg)
![](https://negrosconstruction.com/wp-content-old/uploads/2017/10/thumb/0924171519a.jpg)
![](https://negrosconstruction.com/wp-content-old/uploads/2017/10/thumb/0924171519b.jpg)
For the walls, we have used a special mixture cement hollow block, with 10 mm steel reinforcing rod tied in both horizontally and vertically. Over all doors and windows we have formed a reinforced concrete lintel.