DAUIN SEMI DETACHED HOME PROGRESS 06/30
A lot has happened on this construction project since we last posted an update around mid-March.
Structural columns and beams made of reinforced concrete.




Fabrication and installation of steel roof trusses.








Electrical and plumbing rough-in.





Parging of walls with cement rendering








Framing of the ceilings.





Installing fascia , eaves trough and metal roofing panels over foil-backed insulation.










Cutting , treating and installing Germilina hardwood door frames.










Installing drywall ceiling on steel tracks.








