SIQUIJOR BEACH HOUSE CONSTRUCTION PROGRESS TO 08/20
Laying out the location of the home with the help of our surveyor




Getting started by pouring the column and wall footing , then the first few rows of concrete hollow block






Continuing up with the chb walls






Preparing the rebar and constructing the forms for the columns












Forming and pouring the roof beams










Fabricating and starting to install the steel roof trusses










Adding the steel roof purlins and steel framing for the roof edge detail








Laying out where the electrical will be located, then chipping out the CHB and installing the electrical conduit and boxes










Beginning the cement parge rendering of the CHB walls