Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/negrosconstruction.com/public_html/wp-includes/functions.php on line 6121
May 2017 - Negros Construction

Monthly Archives: May 2017

BUILDING OUR REINFORCED CONCRETE COLUMNS

BUILDING OUR REINFORCED CONCRETE COLUMNS

BUILDING OUR REINFORCED CONCRETE COLUMNS With the footings poured, we then move on to the columns. The columns for the first floor will be constructed with reinforced concrete and again we have decided to upgrade the rebar to 16mm instead of 12mm. The main structure columns will be square, howver for the covered terraces, they […]

SITE PREPARATION AND EXCAVATION

SITE PREPARATION AND EXCAVATION

SITE PREPARATION AND EXCAVATION This Valencia 2 unit residential building construction project will provide us with some challenges. These units will be built in an enclosed compound with 3 other existing and fully occupied units. The client has insisted we make every attempt to reduce any inconvenience to her existing tenants during construction. Our first […]

NATIVE HYBRID PROJECT START UP

NATIVE HYBRID PROJECT START UP

NATIVE HYBRID PROJECT START UP Getting ready to start this new 2 story native hybrid house construction, the fist thing we need to do was lay out the footprint of the building. Once we know exactly where the placement of the structure on this lot will be, we started excavation prepare for our column and […]