FLOORS, CABINETS AND OTHER FINISHING Moving along, we have almost finished the upstairs wood plank flooring, but we ran into a problem. The suppier of our Luaun wood for both the main second story and the spiral staircase has run out of wood despite us having put down a deposit and him confirming he had […]
Author Archives: Gordon Mckissock
CEILING AND INSULATION With the building now closed in and water tight, we have started on the ceiling. It will be a drop type ceiling following the slope of the roof in cathedral style in the living room and bedroom, and horizontal in the kitchen, washroom and laundry. It is being constructed with furring channels […]
TILING With the painting of one unit complete, the painter has moved over to the next and allowed us to get started on the tiling. Tiles are set with a mixture of cement and tile grip and carefully leveled. We will continue on with this progression of work so that the different trades men are […]
WALLS AND STRUCTURAL ROOF FRAMING Construction was in high gear over the past month on this project. Columns, beams concrete hollow block walls and the steel roof framing were all completed. We have also completed the 3 chamber septic system.
CEMENT FLOOR AND ROOFING Over the past 2 weeks, we have put the steel panel roofing on, attached securely to 2×2 steel girts which were welded to the site fabricated open web joist system. We have added gutters to all low eaves, which will train through down pipes to the site drainage system. We have […]
TAPING , SANDING AND PAINTING Now that the ceiling board is almost entirely complete, the joints in the drwall have been taped and sanded. The wall too have been sanded properly and painted has started. We have also started applying the decorative stone cladding on the bottom half of the exterior wall of the home.
CABINETS AND TILING Next we are moving on to the tiling, after which we can start installing kitchen cabinets and bedroom closet. These cabinets are made from Sant Clara finish plywood and are being prfabricated outside of the house to be secured in place after the tiling.
PAINTING OF WALLS AND CEILINGS With most of the sanding and painting complete, we now move on to the finish painting. This will be done in a phased approach since there are 4 units in this apartment block. We do want to make sure all painting is complete in a unit before we start the […]
TAPING AND SANDING OF THE CEILING Before finishing the drywall application of the ceiling, we do one last check to ensure all the plumbing and electrical to be located within the ceiling is 100% complete. Once all the base coat of the walls is complete and the grid and boarding of the ceiling finished, our […]
CEILING AND PAINT BASE COAT With the skim coat finished on the wall, we now start the ceiling grid layout and base coat painting of the walls. The ceiling is suspended with a grid of furring channels and for the top floor we cut and place semi rigid rockwool insulation as both a sound barrier […]