FLOORS, CABINETS AND OTHER FINISHING

FLOORS, CABINETS AND OTHER FINISHING

FLOORS, CABINETS AND OTHER FINISHING Moving along, we have almost finished the upstairs wood plank flooring, but we ran into a problem. The suppier of our Luaun wood for both the main second story and the spiral staircase has run out of wood despite us having put down a deposit and him confirming he had […]

CEILING AND INSULATION

CEILING AND INSULATION

CEILING AND INSULATION With the building now closed in and water tight, we have started on the ceiling. It will be a drop type ceiling following the slope of the roof in cathedral style in the living room and bedroom, and horizontal in the kitchen, washroom and laundry. It is being constructed with furring channels […]

WALLS AND STRUCTURAL ROOF FRAMING

WALLS AND STRUCTURAL ROOF FRAMING

WALLS AND STRUCTURAL ROOF FRAMING Construction was in high gear over the past month on this project. Columns, beams concrete hollow block walls and the steel roof framing were all completed. We have also completed the 3 chamber septic system.  

CEMENT FLOOR AND ROOFING

CEMENT FLOOR AND ROOFING

CEMENT FLOOR AND ROOFING Over the past 2 weeks, we have put the steel panel roofing on, attached securely to 2×2 steel girts which were welded to the site fabricated open web joist system. We have added gutters to all low eaves, which will train through down pipes to the site drainage system. We have […]

TAPING , SANDING AND PAINTING

TAPING , SANDING AND PAINTING

TAPING , SANDING AND PAINTING Now that the ceiling board is almost entirely complete, the joints in the drwall have been taped and sanded. The wall too have been sanded properly and painted has started. We have also started applying the decorative stone cladding on the bottom half of the exterior wall of the home.

CABINETS AND TILING

CABINETS AND TILING

CABINETS AND TILING Next we are moving on to the tiling, after which we can start installing kitchen cabinets and bedroom closet. These cabinets are made from Sant Clara finish plywood and are being prfabricated outside of the house to be secured in place after the tiling.

TAPING AND SANDING OF THE CEILING

TAPING AND SANDING OF THE CEILING

TAPING AND SANDING OF THE CEILING Before finishing the drywall application of the ceiling, we do one last check to ensure all the plumbing and electrical to be located within the ceiling is 100% complete. Once all the base coat of the walls is complete and the grid and boarding of the ceiling finished, our […]

CEILING AND PAINT BASE COAT

CEILING AND PAINT BASE COAT

CEILING AND PAINT BASE COAT With the skim coat finished on the wall, we now start the ceiling grid layout and base coat painting of the walls. The ceiling is suspended with a grid of furring channels and for the top floor we cut and place semi rigid rockwool insulation as both a sound barrier […]