June 2017 - Negros Construction

Monthly Archives: June 2017

PREPARING FOR CLOSE IN OF STRUCTURE

PREPARING FOR CLOSE IN OF STRUCTURE

PREPARING FOR CLOSE IN OF STRUCTURE Currently we are working on numerous things on this project. We have just about finalized all the rough in for plumbing and electrical and have been parging all the walls with cement. At the same time we have been fabrication and installing all the roof trusses, purlins and steel […]

EXCAVATION PREPARATION FOR FOOTINGS

EXCAVATION PREPARATION FOR FOOTINGS

EXCAVATION PREPARATION FOR FOOTINGS We have finished the layout of this single story cottage on the beach and now have started with the excavation. We will be going down a minimum of 1 meter, and maybe more depending on the soil conditions. As it is only one story and will not have high structural loading, […]

ENTERTAINING OFFERS FOR AN ACTIVE BUSINESS PARTNER

ENTERTAINING OFFERS FOR AN ACTIVE BUSINESS PARTNER

ENTERTAINING OFFERS FOR AN ACTIVE BUSINESS PARTNER Our business has experienced tremendous growth and success in the past eighteen months , however with that success, comes challenges. We have grown our business on high quality builds and exemplary customer service and we need to maintain those qualities regardless of the increase in demand for our […]

CONSTRUCTION RIGHT ON SCHEDULE

CONSTRUCTION RIGHT ON SCHEDULE

CONSTRUCTION RIGHT ON SCHEDULE Saying the construction is right on schedule is something we very rarely hear in the Philippines. Honestly as hard we try, staying on schedule during a project here is difficult with almost daily frustrations in terms of manpower and materials. More commonly we face issues of suppliers out of material stock […]

A/C, FLOORING AND CEILING

A/C, FLOORING AND CEILING

A/C, FLOORING AND CEILING With the electrical roughing all complete, we then started on Air conditioning, ceiling and flooring. The client provided 3 five ton floor models which were used for the main call center floor and for all the offices we used new split type inverter units. All compressors were mounted on the exterior […]

CALL CENTER FIT UP PROGRESS

CALL CENTER FIT UP PROGRESS

CALL CENTER FIT UP PROGRESS Our first stage was the layout and construction of the steel stud partition walls complete with gyproc board sheeting to one side. Once this was complete, we were able to address one of the most important components of the project, which was the electrical. With a BPO operation, having proper […]

STARTING THE OPEN AIR LIVING STRUCTURE

STARTING THE OPEN AIR LIVING STRUCTURE

STARTING THE OPEN AIR LIVING STRUCTURE The 3 bedroom and washroom phase of this project has been turned over to the clients and now we have turned our efforts to the last remaining structure, which is an open air kitchen, living and dining room. We have also constructed a new native stile fence made of […]

PHASE 2 – MAIN RENO

PHASE 2 - MAIN RENO

PHASE 2 – MAIN RENO With washroom renovation now complete, the clients have visited and left and are preparing for the final move here in late 2017. With their departure the real work begins as we start the second phase of this project which is the addition of a second story. We begin by stripping […]

TURNOVER OF FIRST PHASE AND FOCUSING ON THE RENTAL UNITS

TURNOVER OF FIRST PHASE AND FOCUSING ON THE RENTAL UNITS

TURNOVER OF FIRST PHASE AND FOCUSING ON THE RENTAL UNITS With a looming deadline of the end of April, we worked double and triple shifts to finish the residence portion of this project in order that the clients could move out of the rental house and into their new home. With turnover successful, we turned […]

WALLS ARE UP

WALLS ARE UP

WALLS ARE UP After pouring all the footings, columns and beams, we then focused on getting all the walls up. We used a special mix concrete hollow block to provide better quality walls , as we do in all our projects, and these walls were all reinforced with 10 mm reinforcing steel bar. Once the […]