DAUIN SEMI DETACHED HOME CONSTRUCTION UPDATE 03/15

DAUIN SEMI DETACHED HOME CONSTRUCTION UPDATE 03/15

DAUIN SEMI DETACHED HOME CONSTRUCTION UPDATE 03/15 THIS HOUSE IS FOR SALE (ONLY 6.5 MIL PHP)- IF INTERESTED , PLEASE VISIT THIS LINK https://dumaguetedreamhomes.com/portfolio/casa-alexandria-dauin-community/#sd-duplex-1 After excavation, it is time to prepare and install the steel reinforing rod for the footing ,columns and tie beams. Being a 2 story structure on sandy soil , we use […]

VILLA CONSTRUCTION UPDATE MARCH 15TH

VILLA CONSTRUCTION UPDATE MARCH 15TH

VILLA CONSTRUCTION UPDATE MARCH 15TH When we started excavation, we ran into a not totally unexpected issue. Being on a plateau in the hills there was the high likelihood that we would hit rock when digging and sure enough it was there. We adapted and decided that instead of doing a large scale excavation for […]

SIBULAN HOUSE- FINISHING THE FENCE AND WALL CONSTRUCTION

SIBULAN HOUSE- FINISHING THE FENCE AND WALL CONSTRUCTION

SIBULAN HOUSE- FINISHING THE FENCE AND WALL CONSTRUCTION Just putting the finishing touches on the fencing and this project will be complete after a long 2 years! completing the steel framing and spikes then putting on the the chain link fencing at the South end of the property On the North and East sides we […]

SEA WALL CONSTRUCTION AND FENCING

SEA WALL CONSTRUCTION AND FENCING

SEA WALL CONSTRUCTION AND FENCING The cottage has basically been finished and turned over to the client, and now it is time to make the site secure and livable. We start with building a 2.2 meter high chb wall along the public access beach walkway. This involves constructing reinforced concrete columns, then filling in between […]

FINISHING AND FENCING MARCH UPDATE

FINISHING AND FENCING MARCH UPDATE

FINISHING AND FENCING MARCH UPDATE It’s been a long time since the last post on this construction project, so a lot to go over. Back in November we had just finished the parging/rendering on the hollow block walls and then began the roof framing. This was done by site fabrication of steel trusses using 2×2 […]

DAUIN BEACH SIDE COTTAGE JANUARY UPDATE

DAUIN BEACH SIDE COTTAGE JANUARY UPDATE

DAUIN BEACH SIDE COTTAGE JANUARY UPDATE Since our last update in October, a lot has happened. Interior finishing has been ongoing including kitchen cabinets, granite counter tops, tile backsplash and decorative wood beams on the suspended ceiling, all in conjunction with sanding and painting. On the exterior we have been working on the stone cladding, […]

CONSTRUCTION ONGOING FEBRUARY 2018 SIQUIJOR RESORT

CONSTRUCTION ONGOING FEBRUARY 2018 SIQUIJOR RESORT

CONSTRUCTION ONGOING FEBRUARY 2018 SIQUIJOR RESORT We started by laying out the different buildings with the help of our surveyor Josh Cabio. When we knew where everything was going we began demolishing the existing structures that were going to be in the way. We left 2 structures that were built on top of water reservoirs […]

CONTINUING SITE DEVELOPMENT

CONTINUING SITE DEVELOPMENT

CONTINUING SITE DEVELOPMENT Site Development for this project involves many different components. The first thing we have done is build a large bunk house and storage facility. For this project, we will be here for a longer period and have many more workers than normal so we have not skimped on size and space. The […]