GOING FLAT TO THE WALL

The impending turnover deadline is fast approaching so we are working all out with 2 crews and over 40 workmen on site each day. The kitchen renovation is nearing completion with the installation of the granite counter tops and the finishing of the ceiling. Downstairs we have also re-used some of the existing tiles that were not damaged when earlier removed, and setting these in the bedrooms. We will be short with those existing tiles, so have decided that we will install new tiles in the main living and dining room. We have also re-sanded and primed all the existing downstairs wall and will repaint.

Outside, we have finished the covered roof over the second floor terrace and build reinforced concrete stares from this errace down into the backyard.

Upstairs, we have been constructing the TV wall, and the cabinets for the mini-kitchen.