March 2016 - Negros Construction

Monthly Archives: March 2016

RESIDENCE WITH RENTAL UNITS DESIGN

Residence with Rental Units Design Understanding a Clients Specific Needs The Residence with rental units design process was interesting as this client had some very specific needs that had to be first understood then translated into a workable project. His goal was to have a very comfortable residence while also have rental income to support […]

WEEK 2 – CONSTRUCTION LAYOUT

Week 2 – Construction Layout Starting the Construction Right The construction layout is the first real phase for getting started on the building construction. In simple terms it means measuring then staking out all the points in the lot where the structural footings and foundations will be located. This will require an accurate lot survey […]

WEEK 1 – SITE MOBILIZATION

Site Mobilization Getting Organized for the Valencia House Build With every home build site mobilization is an important staging in planning everything so that the construction can follow smoothly. now that we have designed, agreed to a price and signed a contract with the client outlining the terms and conditions, it is time to actually […]

VALENCIA HOUSE CONSTRUCTION ESTIMATE

Valencia House Construction Estimate Making Sure the Client knows the Cost of his Build   The Valencia House Construction Estimate is the next stage of the build process. Whether you are a do-it yourself builder or a contractor, it is important to have an accurate estimate of your proposed build is going to cost. In […]

VALENCIA HOUSE DESIGN

Valencia House Design Putting the Client’s Vision to Paper The initial Valencia house design stages involved sitting down with the client to determine his needs, budget and style preferences. As he and his wife did not have children, he felt that he did not need more than about 100 square meters of space with a […]