SITE DEVELOPMENT

With this project, there will be many components that all have to fit in together/ Careful planning has to be done so that all the site infrastructure is completed properly in the right locations or the entire community lay out will be affected.

The first thing we have done is get in a geodetic engineer to survey and stake out where the various components will go. We have then brought in heavy equipment to put in a road and do the excavation for such things as the pool and koi ponds. Next in line was digging the well. As this project is a little remote, municipal water supply might be an issue, so the decision was made to dig a well. Though it was not a total surprise, the water table was only 60-80 feet deep, and is being fed by a hot spring. Rather than this being an issue, the owner decided to use this to his advantage, incorporating a natural hot spring spa pool into the plan.