WALLS AND STRUCTURAL ROOF FRAMING

WALLS AND STRUCTURAL ROOF FRAMING

WALLS AND STRUCTURAL ROOF FRAMING Construction was in high gear over the past month on this project. Columns, beams concrete hollow block walls and the steel roof framing were all completed. We have also completed the 3 chamber septic system.  

CEILING AND PAINT BASE COAT

CEILING AND PAINT BASE COAT

CEILING AND PAINT BASE COAT With the skim coat finished on the wall, we now start the ceiling grid layout and base coat painting of the walls. The ceiling is suspended with a grid of furring channels and for the top floor we cut and place semi rigid rockwool insulation as both a sound barrier […]

MODEL 3 – ONE STORY STUDIO HOME

This Minimalist style studio home is a perfect starter home for a single person who wants a beautiful and spacious bachelor pad. It has everything you would need for comfortable and functional living at an affordable price. Total floor area of living space(inside and out) – 76 square meters Price – 1,750,000 (SHELL ONLY) MODEL […]

SITE DEVELOPMENT

SITE DEVELOPMENT

SITE DEVELOPMENT With this project, there will be many components that all have to fit in together/ Careful planning has to be done so that all the site infrastructure is completed properly in the right locations or the entire community lay out will be affected. The first thing we have done is get in a […]