DOWNSTAIRS TILING, WINDOWS AND EXTERIOR PAINTING

We have almost fully completed the downstairs tiling and just need to apply the grout. Outside we have finished the exterior walls on the second floor with a 1/2″ cement board with the joints taped and puttied with an epoxy mixture. on the first floor exterior walls we are sanding fully so there will be a seamless transition of paint between new and old. We are also installing the windows which are fabricated with high grade aluminum mullions and further upgraded with laminated glass to protect against unsafe breakage during expected storms.